From Wikipedia, the free encyclopedia

Sunbury
Railways in Melbourne
Diggers Rest station on the Sunbury line.
Platforms at Diggers Rest station on the Sunbury line, November 2012
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusOperational
LocaleMelbourne, Victoria, Australia
Predecessor
  • Sunbury (1859–1861)
  • Woodend (1861–1862)
  • Bendigo (1862–2012)
  • St Albans ^ (1921–2002)
  • Sydenham ^ (2002–2012)
^ are electric services
First service10 February 1859; 165 years ago (1859-02-10)
Current operator(s)Metro Trains
Former operator(s)
Route
TerminiFlinders Street
Sunbury
Stops18 (including City Loop stations)
Distance travelled40.3 km (25.0 mi)
Average journey time49 minutes (not via City Loop)
Service frequency
  • 5–20 minutes weekdays peak
  • 20 minutes weekdays off-peak
  • 20 minutes weekend daytime
  • 30 minutes nights
  • 60 minutes early weekend mornings
Line(s) usedDeniliquin
Technical
Rolling stockComeng, HCMT
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Track owner(s)VicTrack

The Sunbury line is a commuter railway line in the city of Melbourne, Victoria, Australia.[1] Operated by Metro Trains Melbourne, it is the city's fifth longest metropolitan railway line at 40.3 kilometres (25.0 mi). The line runs from Flinders Street station in central Melbourne to Sunbury station in the city's north-west, serving 18 stations via North Melbourne, Sunshine, St Albans, and Watergardens.[2] The line operates for approximately 19 hours a day (from approximately 5:00 am to around 12:00 am) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 minutes are operated with services every 20–30 minutes during off-peak hours.[3] Train sets typically used on the Sunbury line are the Comeng[4] and, for two morning peak services, the High Capacity Metro Train.[5]

The Victorian Railways began services in February 1859 on the line originally built to serve the town of Bendigo by the Melbourne, Mount Alexander and Murray River Railway Company.[6] The line was progressively electrified over time, with electrification to St Albans in 1921, to Sydenham in 2002, and finally to Sunbury in 2012.[7][8][9]

Since the 2000s, due to the heavily utilised infrastructure of the Sunbury line, improvements and upgrades have been made. Works have included replacing sleepers, upgrading signalling technology, two line extension projects, the construction of new stations, the removal of level crossings, the introduction of new rolling stock, and station accessibility upgrades.[10][11]

In 2025, the line is planned to be through-routed to the Pakenham and Cranbourne lines via the underground Metro Tunnel.

History[edit]

19th century[edit]

An old station with wooden railway building
Sunbury station was opened in February 1859 as part of the rail line to Bendigo.

The Melbourne, Mount Alexander and Murray River Railway Company started to build a rail line to Bendigo before operations were taken over by the Department of Railways then the Victorian Railways. The line had been extended as far as Sunbury by February 1859.[6] The line was duplicated between Footscray and Sunbury in early July 1859.[6]

20th century[edit]

Electrification of the line to St Albans was completed in October 1921, although electrification has already occurred to North Melbourne in May 1919 as part of the Essendon line electrification, and to Footscray in August 1920 as part of the Williamstown line electrification.[7] Electrification shaved 10 minutes off the trip from St Albans to the city.[7]

North Melbourne to South Kensington was quadruplicated in 1924, and South Kensington to Footscray in November 1976.[12] Automatic block signalling was provided between South Kensington and Footscray (and Yarraville on the Williamstown line) in August 1927, from Footscray to West Footscray in October 1927, North Melbourne to South Kensington in June 1928, Sunshine to Albion in July 1929, West Footscray to Sunshine in October 1929, and Albion to St Albans in February 1930, thus resulting in the entire electrified line being provided with this signalling.[12]

21st century[edit]

Sydenham extension[edit]

On 27 January 2002, electrification of the St Albans line was extended along the regional V/Line tracks to Sydenham.[8] The Sydenham electrification resulted in the closure of the original Sydenham station; a new station was built 600 metres south and named after the nearby Watergardens Town Centre. Additionally, another station was constructed in St Albans called Keilor Plains.

Sunbury extension[edit]

A train platform
Diggers Rest station was rebuilt as part of the extension.

Proposals for an extension of electrified metropolitan services to Sunbury have dated as far back as the 1969 Melbourne Transportation Plan.[13] $270 million was set aside to complete electrification works as part of the 2008 Victorian Transport Plan, with works completed in 2012.[14]

There was some opposition to electrification. Concerns included a less comfortable journey, the removal of toilet facilities, the presence of a conductor, potential overcrowding, and congestion at level crossings due to the increase in the number of services.[15] Bendigo line users also raised concern that electrification to Sunbury would slow down their trains to Melbourne. Ian Dobbs, then head of Public Transport Victoria acknowledged this issue, stating that "there's a slight slow-down of services on that particular corridor with this timetable, because we're putting more Metro services in the mix."

On 18 November 2012, the newly electrified line was renamed from the Sydenham line to the Sunbury line. Completion of the electrification increased the service frequency of Sunbury and Diggers Rest stations to 489 trains per week, an increase of 64% from the 298 trains per week when the service was operated by V/Line.[16][17]

Sunbury Line Upgrade[edit]

In 2019, works began on the $2.1 billion Sunbury Line Upgrade project, delivered by the Rail Projects Victoria.[11] The project upgraded the line to support the introduction of High Capacity Metro Train (HCMT) rolling stock and "take full advantage of the extra capacity created by the Metro Tunnel" which will open in 2025.[18]

Works delivered as part of the project include the installation of five new electrical substations: one in Delahey (near Watergardens station)[19], one in Calder Park rail yard[20], two in St Albans[21][22], and one in Albion[23][24]; ten more across the line were upgraded along with improvements to overhead wiring and signalling equipment to enable the use of "high capacity signalling" (a form of communications-based train control[25]) in the Metro Tunnel. Platforms were extended at Sunbury, Watergardens, Albion, Sunshine, Tottenham, West Footscray, Middle Footscray, and Footscray stations to support the longer HCMT rolling stock. Raised boarding pads were installed at Sunbury, Diggers Rest, Watergardens, Keilor Plains, Albion, Sunshine, and Footscray stations to improve wheelchair accessibility.[26] Train stabling facilities at Sunbury, Calder Park, and Watergardens were upgraded,[27] the level crossing at Gap Road, Sunbury was removed[28], and the tracks connecting the Sunbury line to the Metro Tunnel's portal at South Kensington station were laid.[29]

Future[edit]

Metro Tunnel[edit]

A map showing the route of the Melbourne Metro tunnel heading through the CBD
The map of the Metro Tunnel route through the Melbourne central business district.

The 2012 Network Development Plan identified the need for a north–south tunnel connecting the Sunbury line to the Cranbourne and Pakenham lines.[30] In 2017, the Metro Tunnel project began construction, consisting of twin 9-kilometre (5.6 mi) tunnels bored underground between South Kensington and South Yarra stations, with five new stations along the route: Arden, Parkville, State Library (connecting to Melbourne Central), Town Hall (connecting to Flinders Street), and Anzac. These works will be completed by 2025, and upon completion, will create a singular rail line from Sunbury to Pakenham.[10]

Level crossing removals[edit]

A lowered train station platform
Ginifer station was rebuilt during the removal of the Furlong Road level crossing.

The Level Crossing Removal Project has announced the removal of all 7 remaining level crossings on the Sunbury line, completed in stages from 2016 to 2025. In 2016, the level crossings at Furlong Road and Main Road, St Albans, were removed by lowering the rail line into a trench under the roads; St Albans and Ginifer stations were rebuilt.[31][32] Another crossing was removed by elevating a section of the Melton Highway in Sydenham onto a bridge above the rail line in 2018.[33] The remaining level crossings are planned to be removed in 2025. The crossings at Old Calder Highway, Watsons Road, and Calder Park Drive will be removed by building road bridges over the rail line, and the Holden Road crossing will be closed to car traffic.[34][35][36]

Network and operations[edit]

Services[edit]

Services on the Sunbury line operates from approximately 5:00 am to around 12:00 daily.[1] In general, during peak hours, train frequency is 5–20 minutes in the AM peak on the Sunbury line while during non-peak hours the frequency is reduced to 20–30 minutes throughout the entire route.[3] On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.[37]

Train services on the Sunbury line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.[38]

Stopping patterns[edit]

Legend — Station status

  • Premium Station – Station staffed from first to last train
  • Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.

Legend — Stopping patterns
Some services do not operate via the City Loop

  • ● – All trains stop
  • ◐ – Some services do not stop
  • | – Trains pass and do not stop
Sunbury Services[39]
Station Zone Local Ltd Express Watergardens
Flagstaff 1
Melbourne Central
Parliament
Flinders Street
Southern Cross
North Melbourne
Footscray
Middle Footscray |
West Footscray |
Tottenham |
Sunshine 1/2
Albion
Ginifer 2
St Albans
Keilor Plains
Watergardens
Diggers Rest
Sunbury

Operators[edit]

The Sunbury line has had a total of 7 operators since its opening in 1859. The majority of operations throughout its history have been government run: from its first service in 1859 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[40] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation, and Bayside Trains have a combined operational length of 141 years.

Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.[41][42][43] Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Sunbury line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of 23 years.[44]

Past and present operators of the Sunbury line:
Operator Assumed operations Ceased operations Length of operations
Victorian Railways 1859 1983 124 years
Metropolitan Transit Authority 1983 1989 6 years
Public Transport Corporation 1989 1998 9 years
Bayside Trains (government operator) 1998 2000 2 years
M>Train 2000 2004 4 years
Connex Melbourne 2004 2009 5 years
Metro Trains Melbourne 2009 incumbent 14 years (ongoing)

Route[edit]

Map
Interactive map of the Sunbury line in north-western Melbourne.

The Sunbury line forms a relatively linear route from the Melbourne central business district to its terminus in Sunbury. The route is 40.3 kilometres (25.0 mi) long and is fully doubled tracked from Flinders Street to its termnius. The only underground section of the Sunbury line is in the City Loop, where the service stops at 3 underground stations.[45] Exiting the city, the Sunbury line traverses mainly flat country, except on the west bank of the Maribyrnong River where it requires some moderately heavy earthworks. The line is paralleled by a double track goods line and the interstate standard gauge line, the latter being dual gauge with the goods line to West Footscray. The goods line joins the Sunbury line at Sunshine, whilst the standard gauge line to Sydney continues to run alongside the suburban line to Albion, where it and a goods line head off in a north-easterly direction. Some sections of the line has been elevated or lowered into a cutting to eliminate level crossings.[46]

The line follows the same alignment as multiple lines with the Sunbury line splitting off at North Melbourne. The Sunbury line continues on its western (then northern) alignment, whereas the other lines continue onto a northern, western, or south-western alignment.[47] Most of the rail line goes through built-up suburbs and some industrial areas before becoming more rural before the end of the line.[47]

Stations[edit]

The line serves 18 stations across 40.3 kilometres (25.0 mi) of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of level crossing removals.[48] From 2025, services will cease to stop at Flinders Street, Southern Cross, Flagstaff, Melbourne Central, Parliament, and North Melbourne stations due to the opening of the Metro Tunnel.

Station Accessibility Opened Terrain Train connections Other connections
Flinders Street Yes—step free access 1854[49] Lowered Trams Buses
Southern Cross 1859[49] Ground level Trams Buses Coaches SkyBus
Parliament 1983[49] Underground Trams
Melbourne Central 1981[49] Trams Buses
Flagstaff 1985[49] Trams
North Melbourne 1859[49] Ground level Buses
Footscray Trams Buses
Middle Footscray No—steep ramp 1906[49] Buses
West Footscray Yes—step free access 1888[49]
Tottenham No—steep ramp 1891[49]
Sunshine Yes—step free access 1885[49]
4 connections
Buses
Albion No—steep ramp 1860[49]
Ginifer Yes—step free access 1982[49] Below ground
St Albans 1887[49]
Keilor Plains 2002[49] Ground level
Watergardens 1859[49]
2 connections
Diggers Rest
Sunbury
2 connections
Buses Coaches
Station histories
Station Opened[50] Closed[50] Age Notes[50][10]
Flagstaff 27 May 1985 39 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
Melbourne Central 26 January 1981 43 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Museum
Parliament 22 January 1983 41 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
Flinders Street 12 September 1854 169 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Melbourne Terminus
Southern Cross 17 January 1859 165 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Batman's Hill
  • Formerly Spencer Street
North Melbourne 6 October 1859 164 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
South Kensington 11 March 1891 133 years
  • Not a stop since 2013
Saltwater River 1 October 1859 c. 1867 Approx. 7 years
Footscray 24 September 1900 123 years
Middle Footscray 10 February 1859 24 September 1900 41 years
  • 1st site
  • Formerly Footscray (Main line)
10 December 1906 2 July 1927 20 years
  • 2nd site
3 July 1927 96 years
  • 3rd site
West Footscray 1 October 1888 135 years
  • Formerly Footscray West
Tottenham 2 March 1891 133 years
White City 10 December 1927 4 October 1981 53 years
Maidstone 2 March 1861 1 April 1865 4 years
Sunshine 7 September 1885 138 years
  • Formerly Braybrook Junction
Albion 5 January 1860 1 January 1861 11 months
  • 1st site
  • Was originally Albion and Darlington
24 March 1891 24 November 1919 28 years
  • 1st site
  • Reopened as Albion
24 November 1919 104 years
  • 2nd site
Ginifer 31 October 1982 41 years
St Albans 1 February 1887 22 November 1959 72 years
  • 1st site
22 November 1959 64 years
  • 2nd site
Keilor Plains 11 September 2002 21 years
Watergardens 1 March 1859 11 September 2002 143 years
  • Was originally Keilor Road
  • Later Sydenham
11 September 2002 21 years
  • Reopened as Watergardens
Calder Park Sidings 15 December 2014 9 years
Holden 5 January 1860 1 January 1861 11 months
Diggers Rest 2 October 1859 164 years
Sunbury 10 February 1859 165 years
Rupertswood 1879 ?
  • Private platform for William John Clarke
Between 1909 and 1913 3 November 1941 28–32 years
7 February 1962 2004 42 years

Planned stations[edit]

Station Accessibility Expected opening Terrain Planned train connections Other planned connections Notes
Arden Yes—step free access 2025[10] Underground
2 connections
Opening as part of the Metro tunnel project in 2025[10]
Parkville Trams
State Library Trains Trams Buses
Town Hall Trains Trams Buses Trains
Anzac Trams

Infrastructure[edit]

Rolling stock[edit]

A modern train at a station that is falling apart
A Siemens Nexas train at Tottenham station.

The Sunbury line primarily uses Comeng electric multiple unit (EMU) trains that are operated in a split six-car configuration, with three doors per side on each carriage. These trains were built by Commonwealth Engineering between 1981 and 1989[citation needed], making them the oldest on Melbourne's electrified sububran rail network. Occasionally, Siemens Nexas EMUs are also used. When the Metro Tunnel opens in 2025, the Sunbury line will be operated mainly with High Capacity Metro Train EMUs.[51]

Alongside the passenger trains, Sunbury line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[52] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains Melbourne, and Southern Shorthaul Railroad.[52]

Planned rolling stock[edit]

HCMT set 48 operating the down Pakenham service passes Hawksburn station, August 2023
High Capacity Metro Trains (HCMT) will operate most services on the line from 2025.

Upon the opening of the Metro Tunnel in 2025, the Sunbury line will primarly use a fleet of High Capacity Metro Train (HCMT) electric multiple unit trains, operating in a seven-car configuration. The trains feature three doors per side on each carriage and can accommodate up to 1,380 passengers. HCMTs were introduced to the Sunbury line in 2023, operating two peak services from Sunbury to Flinders Street each morning.[53] HCMTs are also planned to be used on the Airport line, which will branch off from the Sunbury line at Sunshine.[54] HCMTs are built in Changchun, China, with final assembly occurring in Newport, Melbourne, by Evolution Rail, a consortium composed of CRRC Changchun Railway Vehicles, Downer Rail and Plenary Group.[55] As of October 2023, two HCMT services run per day on the Sunbury Line, with more to be gradually introduced in the coming years.

Accessibility[edit]

A modern, lowered train station
St Albans station features wheelchair accessible ramps and elevators.

In compliance with the Disability Discrimination Act of 1992, all stations that were newly built or rebuilt since the Act took effect comply with its guidelines.[56] Most stations on the Sunbury line are fully accessible, however, there are some stations that have not been upgraded to meet these guidelines.[57] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature elevators.[57] Accessible stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[57][58]

Several stations on the Sunbury line have been rebuilt or upgraded with better accessibility features, mostly as part of the Level Crossing Removal Project and the Sunbury Line Upgrade. This includes St Albans and Ginifer stations, which were rebuilt as part of the Level Crossing Removal Project; and Sunbury, Diggers Rest, Watergardens, Keilor Plains, Albion, Sunshine, and Footscray stations which had raised boarding pads installed to improve wheelchair accessibility as part of the Sunbury Line Upgrade.

Signalling[edit]

The Sunbury line uses three-position signalling which is widely used across the Melbourne train network.[59] Three-position signalling was first introduced in 1929, with the final section of the line converted in 2005.[60][61] The Sunbury line's signalling system was further upgraded as part of the Sunbury Line Upgrade to enable the use of "high capacity signalling" (a form of communications-based train control) to be used within the Metro Tunnel.[62][11]

References[edit]

  1. ^ a b "Sunbury Line". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 16 April 2023.
  2. ^ "Metro's paper timetables mess". Daniel Bowen. 3 September 2017. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  3. ^ a b "New timetable train line information – Public Transport Victoria". 1 March 2021. Archived from the original on 1 March 2021. Retrieved 18 December 2022.
  4. ^ Carey, Adam (7 November 2014). "Trains are working better but seating not guaranteed". The Sydney Morning Herald. Archived from the original on 6 February 2023. Retrieved 6 February 2023.
  5. ^ Build, Victoria’s Big (31 October 2023). "Bigger, better trains on the Sunbury Line". Victoria’s Big Build. Retrieved 24 June 2024.
  6. ^ a b c "MELBOURNE, MOUNT ALEXANDER, AND MURRAY RIVER RAILWAY COMPANY". Argus. 24 March 1853. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  7. ^ a b c "ST. ALBANS LINE". Independent. 1 October 1921. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  8. ^ a b "Were there more trains 100 years ago? (Part two)". Daniel Bowen. 7 November 2020. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  9. ^ "Extending Sydenham to Sunbury". Daniel Bowen. 24 March 2009. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  10. ^ a b c d e Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Archived from the original on 7 December 2022. Retrieved 9 December 2022.
  11. ^ a b c Victoria’s Big Build (10 October 2022). "About the Sunbury Line Upgrade". Victoria’s Big Build. Archived from the original on 12 August 2021. Retrieved 17 April 2023.
  12. ^ a b "AUTOMATIC SIGNALS FROM MELBOURNE TO ST. ALBANS". Sunshine Advocate. 15 August 1930. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  13. ^ C L Fouvy. "The Melbourne region's opportunity and need for rapid transit" (PDF). Railway Technical Society of Australasia. Archived from the original (PDF) on 21 July 2008. Retrieved 18 July 2008.
  14. ^ https://www.ancr.com.au/sunbury_electrification_project.pdf
  15. ^ Carey, Adam (13 August 2012). "Some in Sunbury not galvanised by train electrification". The Age. Melbourne. Archived from the original on 17 October 2012. Retrieved 8 October 2012.
  16. ^ "transport.vic.gov.au – Sunbury Electrification. (It's part of the plan)" (PDF). Archived (PDF) from the original on 20 September 2009. Retrieved 1 September 2009.
  17. ^ "Media release, Terry Mulder, Victorian Minister for Public Transport, 19 September 2012". Archived from the original on 22 September 2012. Retrieved 8 October 2012.
  18. ^ Build, Victoria’s Big (11 April 2024). "Sunbury Line Upgrade". Victoria’s Big Build. Retrieved 24 June 2024.
  19. ^ jimjin (10 January 2022). "Works occurring at Delahey, St Albans". Brimbank & North West. Retrieved 24 June 2024.
  20. ^ Build, Victoria’s Big (28 February 2022). "Powering bigger Sunbury Line trains". Victoria’s Big Build. Retrieved 24 June 2024.
  21. ^ "New electrical substation on St Albans Road, St Albans | Sunbury Line Upgrade". Engage Victoria. Retrieved 24 June 2024.
  22. ^ "New electrical substation on Willaton Street, St Albans | Sunbury Line Upgrade". Engage Victoria. Retrieved 24 June 2024.
  23. ^ "Doing The Work To Power Bigger Sunbury Line Trains | Premier of Victoria". www.premier.vic.gov.au. Retrieved 24 June 2024.
  24. ^ "Work Powers Ahead On The Sunbury Line Upgrade | Premier of Victoria". www.premier.vic.gov.au. Retrieved 24 June 2024.
  25. ^ Vitale, Cat (10 October 2023). "Melbourne's metro tunnel receives "hi-tech" signalling system". Railway Technology. Retrieved 24 June 2024.
  26. ^ Build, Victoria’s Big (11 April 2024). "Sunbury Line Upgrade". Victoria’s Big Build. Retrieved 24 June 2024.
  27. ^ "High Capacity Metro Trains Project". www.vic.gov.au. 18 June 2024. Retrieved 24 June 2024.
  28. ^ "Engage Victoria". engage.vic.gov.au. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  29. ^ Build, Victoria’s Big (13 July 2023). "Sunbury Line Upgrade is now complete". Victoria’s Big Build. Retrieved 24 June 2024.
  30. ^ "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 11 December 2022.
  31. ^ Victoria’s Big Build (21 June 2022). "Furlong Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  32. ^ Victoria’s Big Build (21 June 2022). "Main Road, St Albans". Victoria’s Big Build. Archived from the original on 17 April 2023. Retrieved 17 April 2023.
  33. ^ Victoria’s Big Build (21 June 2022). "Melton Highway, Sydenham". Victoria’s Big Build. Archived from the original on 7 April 2023. Retrieved 17 April 2023.
  34. ^ Victoria’s Big Build (21 June 2022). "Holden Road, Calder Park". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 17 April 2023.
  35. ^ Build, Victoria’s Big (16 April 2024). "Calder Park Drive, Calder Park". Victoria’s Big Build. Retrieved 24 June 2024.
  36. ^ "Diggers Rest level crossing removals". Engage Victoria. Retrieved 24 June 2024.
  37. ^ "Melbourne Weekend Night Network Train Map" (PDF). 2022. Archived (PDF) from the original on 12 January 2023. Retrieved 18 December 2022.
  38. ^ "Where do train replacement buses come from?". ABC News. 15 November 2016. Archived from the original on 14 December 2022. Retrieved 18 December 2022.
  39. ^ "Sunbury Line". Public Transport Victoria. Archived from the original on 16 April 2023. Retrieved 15 April 2023.
  40. ^ "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
  41. ^ National Express walks out of Australian rail service Archived 12 January 2018 at the Wayback Machine The Daily Telegraph (London) 17 December 2002
  42. ^ Receivers take over train, tram group Archived 26 October 2012 at the Wayback Machine The Age 24 December 2002
  43. ^ Victorian passenger services get new managers Archived 25 March 2023 at the Wayback Machine Rail Express 28 January 2003
  44. ^ Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 1 January 2023. Retrieved 1 January 2023.
  45. ^ "Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  46. ^ Wong, Marcus (10 May 2021). "Level crossing removals in 1920s Melbourne". Waking up in Geelong. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  47. ^ a b Wray, Tyson (19 January 2017). "Melbourne's train lines definitively ranked from best to worst". Time Out Melbourne. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  48. ^ Lee, Robert S. (2007). The railways of Victoria 1854–2004. Rosemary Annable, Donald S. Garden. Carlton, Vic.: Melbourne University Publishing. ISBN 978-0-522-85134-2. OCLC 224727085. Archived from the original on 8 May 2022. Retrieved 29 December 2022.
  49. ^ a b c d e f g h i j k l m n o "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". 3 August 2018. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  50. ^ a b c Anderson, Rick (2010). Stopping All Stations. Clunes, Victoria: Full Parallel Productions. ISBN 978-0646543635. OCLC 671303814.
  51. ^ Jacks, Timna (18 May 2021). "Ballarat plant bags $1b contract for 25 new Melbourne trains". The Age. Archived from the original on 6 February 2023. Retrieved 6 February 2023.
  52. ^ a b "NETWORK SERVICE PLAN | Addenda". 1 February 2011. Archived from the original on 7 March 2011.
  53. ^ Build, Victoria’s Big (31 October 2023). "Bigger, better trains on the Sunbury Line". Victoria’s Big Build. Retrieved 24 June 2024.
  54. ^ Planning, Department of Transport and. "Bigger trains for a better Melbourne". dtp.vic.gov.au. Archived from the original on 10 March 2023. Retrieved 10 March 2023.
  55. ^ Galloway, Anthony (24 August 2016). "Alarm over Chinese trains".
  56. ^ "Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  57. ^ a b c "Station accessibility features". Metro Trains Melbourne. 2023. Archived from the original on 8 December 2022. Retrieved 3 January 2023.
  58. ^ "Accessing public transport". City of Melbourne. n.d. Archived from the original on 6 December 2022. Retrieved 3 January 2023.
  59. ^ "A walk around Gunning". vrhistory.com. Archived from the original on 15 August 2022. Retrieved 7 February 2023.
  60. ^ "National Code 3-Position Speed Signalling" (PDF). Archived (PDF) from the original on 7 February 2023. Retrieved 8 April 2023.
  61. ^ Chan, Ray (25 April 2022). "New signalling system for regional rail line". Rail Express. Archived from the original on 11 April 2023. Retrieved 11 April 2023.
  62. ^ Build, Victoria’s Big (31 May 2024). "High Capacity Signalling". Victoria’s Big Build. Retrieved 24 June 2024.