Jump to content

Talk:List of commercial nuclear reactors

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Netherlands[edit]

There's no new nuclear reactors planned at Borssele. I am removing this section of the table. 86.84.200.125 (talk) 15:48, 30 October 2023 (UTC)[reply]

Canada[edit]

Reference to the little known slowpoke at tunney's pasture http://www.cnsc-ccsn.gc.ca/fr/commission/pdf/trans-03-H14.pdf

St. Lucie plant[edit]

What happened to the St. Lucie NPP? [1] I will research it and add it in. 216.164.138.57 16:31, 24 Jun 2005 (UTC)

Someone will still have to modify the NRC Region 2 template. 216.164.138.57 17:01, 24 Jun 2005 (UTC)

Lianjiang Unit 1 and 2 is already under construction[edit]

Lianjiang Unit 1 and 2 is already under construction.

Lianjiang Unit 1 Begin building at 2022/09/28 https://www.cnnpn.cn/article/32918.html

Lianjiang Unit 2 Begin building at 2023/04/15 https://www.cnnpn.cn/article/36309.html 2001:B011:C040:2444:989B:6271:875:3A3C (talk) 17:45, 13 June 2023 (UTC)[reply]

Lufeng 6 Begin building 26 Aug 2023
Also Shidaowan has 2 Units of CAP1400 under construction since 2019 .
Not be confuse with the 2 new planned Hualong One on the same plant.
They are different Units. 2001:B011:C040:39F9:6DF2:29B0:F883:635B (talk) 17:57, 29 August 2023 (UTC)[reply]
Construction of first unit at Lianjiang under way
https://www.world-nuclear-news.org/Articles/Construction-of-first-unit-at-Lianjiang-under-way
Also the list is missing 2 new planned Hualong One at Shidaowan. 2001:B011:C040:1AD4:F142:B19E:2DF0:4B34 (talk) 18:29, 12 October 2023 (UTC)[reply]
Xudabao Unit 1 began construction at 15 November 2023
https://www.world-nuclear-news.org/Articles/Work-on-Xudabao-unit-1-gets-under-way 2001:B011:C008:1B61:28CC:9261:A1C8:5F27 (talk) 16:20, 16 November 2023 (UTC)[reply]
Zhangzhou unit 3
CNNC has now announced that work on Phase II has commenced, with the pouring of first concrete for the nuclear island of Zhangzhou unit 3 on 22 February.
https://www.world-nuclear-news.org/Articles/Construction-starts-on-second-phase-of-Zhangzhou-p
Jinqimen nuclear power plant
https://www.world-nuclear-news.org/Articles/Preparations-begin-for-new-Chinese-plant 2001:B011:C008:59F2:70E8:8728:1AE2:27AC (talk) 16:53, 22 February 2024 (UTC)[reply]
Shidaowan II-1 and Shidaowan II-2 are currently Under construction , not Planned.
Shidaowan II-1 CAP1400 Construction Start 19 June 2019
https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-1
Shidaowan II-2 CAP1400 Construction Start 21 April 2020
https://www.world-nuclear.org/reactor/default.aspx/SHIDAOWAN-2
Shidaowan Units under const. 2 × 1400 MW
https://en.wikipedia.org/wiki/Shidao_Bay_Nuclear_Power_Plant 2001:B011:C008:1AA2:8172:3AA6:C813:14B6 (talk) 17:54, 27 February 2024 (UTC)[reply]
Unit 2 of the Shin Hanul nuclear power plant in South Korea has entered commercial operation
https://www.world-nuclear-news.org/Articles/Fourth-Korean-APR-1400-begins-commercial-operation 2001:B011:C008:5658:5DB3:8381:66E1:6A1D (talk) 15:21, 8 April 2024 (UTC)[reply]

Sorting tables by dates leaves them out of order.[edit]

Sorting the rows of the tables by date does not work. How can we fix this? 2601:42:C07F:6560:4D2B:141:548E:92A8 (talk) 19:04, 20 April 2024 (UTC)[reply]

This works for me, can you point out the specific table where it's not working? --Ita140188 (talk) 07:17, 23 April 2024 (UTC)[reply]